Ipe Deck Construction

June 2005
120x120

We had started to plan for a deck the previous summer but ran into problems with a contractor who kept vanishing. So, as soon as the weather turned dry, we looked...


120x120

The framing is mostly in place by this time, and the deck joists are insulated with the Vycor deck protector.


120x120

Since the irrigation main shutoff and the sewer cleanout would be buried under the deck, we planned for an access hatch where the joists are spaced out a bit more than elsewhere.


120x120

There is even a catch basin under the deck to capture the water.


120x120

The steps are being framed.



    July 2005
120x120

The Ipe decking is installed.


120x120

The steps are the final step.


120x120

Now, we can get around the back without getting mud all over our shoes.


120x120

Happy.


120x120

and found The World's Most Reliable Handyman, aka Victor R., who made things right.


120x120

This is where we had planned for some wide steps to get from the upper level down to the lower deck, in line with the bottom step of the spiral stairs.


120x120

On this day, Victor had a helper. Most days he worked by himself.


120x120

Making all the levels work was a bit tricky.


120x120

This was an education in Simson Ties.





120x120

Steve's inspection.


120x120

The rest of the yard served well as the staging area.


120x120

My plan is to build a raised veggie planter next to the deck.


    April 2006
120x120

And so, by the following spring we did!


free hit 